
main technical parameters
1, Model: H12X-16T
2Select high-quality copper materials and adopt red punching hot forging process;
3. The working medium is water, oil, gas, etc.(depending on the specific conditions of the valve);
4, working temperature t≤120℃;
5The nominal pressure is 1.6MPa.
安装指南
1During installation, you should first check the recovery seat and whether the O-shaped seal ring on the connection seat is assembled and whether there is any damage to avoid leakage. When the water quality is very poor, check and replace it regularly to avoid rust spots sticking to the sealing surface and causing drainage;
2, should be installed vertically in the system, where the hot water and heating system should be installed at the highest point of the end valve of the pipeline system;
3During installation, tighten the connection seat first, and then tighten the valve body. After installation, loosen the small end cap to allow gas to be discharged;
4When cleaning is needed, first tighten the small end cap, and then remove the valve body and its upper parts;
5. Do not loosen the connecting seat when unscrewing the valve body. The restoring seat will automatically move up to close the channel.
